Tanzania MEPS: Appliance Energy Rules Start Nov 17

海外政策 Published on 2026-10-28 350

Key Points

  • Tanzania's Bureau of Standards (TBS) has gazetted mandatory Minimum Energy Performance Standards (MEPS) for electrical appliances, phased in from 17 November 2026.
  • Phase one covers electric pressure cookers, rice cookers and induction cookers; phase two from 8 December covers electric motors, refrigerators, fans and televisions.
  • Regulated appliances must carry a star-rated energy label with a QR code, and imported goods will be checked at the border.

Policy Changes This Week

TBS mandatory energy efficiency standards (MEPS) and labels

The Tanzania Bureau of Standards (TBS) confirmed at a press briefing in Dar es Salaam in late October 2026 that MEPS enforcement starts in two phases: 17 November 2026 for electric pressure cookers, rice cookers and induction cookers, and 8 December 2026 for electric motors, refrigerators, fans and televisions. Air conditioners fall within the wider programme, and lighting equipment has been repeatedly named as a category to be included; check TBS notices for the exact batch. The standards were gazetted in October 2026 under the Standards Act, and importers, manufacturers and distributors were given a grace period to align. All regulated appliances must display a five-star energy label with an embedded QR code that links to the TBS database. TBS stated that imported products will be inspected at entry points and that non-compliant businesses face legal penalties once the deadlines pass.

Impact on Your Export Business

Certification. Household appliances and lighting are already on the TBS regulated list, so a Certificate of Conformity (COC) must be obtained before shipment; shipments without it can face fines of 15% to 50% of the cargo value, detention or return. MEPS testing and labelling now come on top of that.

Cost. Energy performance testing is charged per model, so a wide SKU range multiplies the cost. Add EAC Common External Tariff duties, 18% VAT, the railway development levy and clearance fees — landed cost for consumer goods commonly runs 30% to 50% above CIF. Recalculate before quoting.

Customs. Lodge declarations through TANCIS at least seven days before arrival, keep the invoice, packing list, test report and shipping marks consistent, and make sure cartons carry Made in China origin markings. Your buyer needs a TIN and a licensed clearing agent.

Delivery. Free storage at Dar es Salaam port lasts only a few days, then daily charges apply. If clearance stalls over missing energy documents, demurrage can erase the margin on a small consignment.

Market Watch & Product Ideas

Demand side: inflation is moderate and the macro base is relatively stable for East Africa; the FYDP IV plan keeps infrastructure and agricultural mechanisation moving, off-grid solar keeps expanding in rural areas, and the year-end festive stocking season is close. Chinese exports to Tanzania have kept growing in motorcycle parts and solar products in recent years (China customs data, 2025-2026).

Worth attention: LED lighting and solar products (electronics) — lighting is named in the MEPS pipeline, and high efficiency is a selling point rather than a burden, but schedule COC and energy documentation together and start three weeks ahead; test reports from ISO/IEC 17025 laboratories are valid for one year. Household plastic products sit outside MEPS: steady demand and they consolidate well in LCL shipments. Rice cookers and induction cookers are in phase one; if you want in, start with one or two core models for testing before widening the range.

Hold off: large white goods such as refrigerators, air conditioners and televisions — heavy cargo, high freight and demurrage exposure, plus high compliance spending. Not a first move for exporters on a budget under CNY 1 million.

Actions for the Next 30 Days

  1. Check your HS codes against the MEPS categories and confirm the applicable phase and standard number with TBS or its appointed inspection bodies.
  2. For kitchen appliances shipping before 17 November, book COC and energy testing together and start at least three weeks before the vessel date.
  3. Audit test reports: issued by ISO/IEC 17025 laboratories, within one-year validity, and consistent with invoice, packing list and marks.
  4. Prepare label artwork with the QR code and have factories apply it on packaging and units before inspection.
  5. Ask buyers to arrange a TIN, import documents and a licensed clearing agent, and lodge TANCIS declarations seven days ahead.
  6. Write demurrage liability and exchange-rate responsibility into quotes, and confirm the payment route against local currency swings.

Feel free to contact us for category-specific certification timing and product advice.

Disclaimer & Reminder

This article is compiled from public announcements and TBS briefings reported by Tanzanian media and does not constitute legal or customs advice. Rates, standard numbers and effective dates follow the latest official Tanzanian announcements (Government Gazette, TRA and TBS websites).