Tanzania EAC Tariff Bands: Check Landed Cost Before Shipping

海外政策 Published on 2026-11-04 278

Key Points

  • No new Tanzanian tariff or market-access notice appeared in the past seven days; the work this week is to get two rules that are already in force right.
  • The EAC Common External Tariff still runs 0/10/25/35 per cent. Most finished consumer goods sit at 25 per cent, and with 18 per cent VAT plus the railway levy the landed cost often reaches 30 to 50 per cent of cargo value.
  • TBS certificates of conformity are electronic only. A container that arrives without an e-COC faces a fine, detention or re-export.

Policy Changes This Week

Nothing new was published this week. Both items below are already effective. We repeat them because they are where small exporters actually lose money.

1. EAC Common External Tariff bands, on the 2026/27 fiscal year basis

Set by the EAC Council of Ministers and Tanzania's Ministry of Finance, applied by TRA inside the TANCIS declaration system. In force since 1 July 2026 and still the basis for entries lodged now. Duty follows the degree of processing: 0 per cent on raw materials and capital equipment, 10 per cent on semi-finished goods and hardware, 25 per cent on finished consumer goods, 35 per cent on sensitive or protected lines. The base is CIF, and the 18 per cent VAT is charged on CIF plus duty. The railway development levy and the customs processing fee come on top.

2. TBS conformity certificates are issued in electronic form only

Issued by the Tanzania Bureau of Standards (TBS) and executed through its appointed PVoC agents. Paper certificates stopped being accepted on 1 November 2025, and the rule is still being enforced at the port. What it controls is pre-shipment verification: controlled products need an electronic certificate (e-COC) before loading, and there is no route to obtain one after the vessel sails. Arrivals without it are fined, held or returned.

Impact on Your Export Business

  • Cost. A generator set with a CIF value of USD 10,000 pays 0 per cent as capital equipment and 25 per cent as a finished appliance. Add 18 per cent VAT and roughly 2 per cent for the railway levy and processing fee, and the gap between the two readings approaches a fifth of the cargo value. One wrong HS digit can take the whole margin. This is the most common problem we see on machinery and equipment shipments.
  • Lead time. The e-COC has to be in hand before loading. Test reports must come from an ISO/IEC 17025 laboratory and are valid for one year. Book at least three weeks; miss the vessel and you wait for the next one.
  • Clearance. Invoice, packing list, test report and shipping marks must agree line for line. Outer cartons need a Made in China origin mark. The importer needs a TIN and a licensed clearing agent. VAT deferment on capital goods ended at the close of June 2026, so do not quote on the old assumption.
  • Port. Free storage at Dar es Salaam runs a few days, then charges accrue daily. Zanzibar clears under ZBS and ASYCUDA++ separately from the mainland, so one document set will not serve both.

Market Watch & Product Ideas

Demand: the shilling has been soft this year without breaking down, and the first year of FYDP IV carries a heavy infrastructure programme, so small farm machinery, water pumps and generator sets find real buyers. Off-grid lighting and household solar move ahead of the rainy season. Access: luminaires, electrical appliances, auto parts and some building materials sit on the TBS controlled list, where the e-COC is a hard gate rather than a formality.

  • Worth watching, auto parts. Motorcycle and three-wheeler parts are light, cube-friendly, and replacement demand from bajaji and boda traffic is steady. A first order of USD 15,000 to 25,000 is enough to test two or three SKUs.
  • Worth watching, electronics. LED lamps and small solar kits. Price the e-COC in as a fixed cost from the start and fix the model list before you book space, not while loading.
  • Worth watching, machinery. Small water pumps and micro-tillers enter at 0 per cent duty as capital equipment, which makes the landed-cost maths friendlier than finished appliances.
  • Hold back. Tiles and sanitaryware are heavy; freight plus daily port charges will eat the margin at this order size. Second-hand clothing is restricted at EAC level and not worth the risk.

Actions for the Next 30 Days

  1. Confirm the eight-digit HS code and the CET band, then build a full landed-cost sheet: CIF plus duty plus 18 per cent VAT plus railway levy plus processing fee plus agent fee.
  2. Check whether the product is on the TBS controlled list, and start the e-COC three weeks before the planned sailing date.
  3. Verify the test report comes from an ISO/IEC 17025 laboratory and is still inside its one-year validity.
  4. Ask the buyer for the TIN and any import permit, and agree in writing which licensed agent files the entry.
  5. Put storage and demurrage at Dar es Salaam, and exchange-rate responsibility, into the quotation terms.
  6. Confirm the payment route before production, and state who carries shilling movement between contract and settlement.

If you are shipping luminaires, auto parts or small farm machinery into Dar es Salaam, feel free to contact us and we will go through the document set with you.

Disclaimer & Reminder

Duty bands, certificate names and effective dates must be checked against the latest Tanzanian official notices, meaning the Government Gazette and the TRA and TBS websites. Confirm the HS line for your own product with a licensed agent before you price a quotation; do not copy a tariff code from someone else's shipment.

This article is compiled from public announcements and does not constitute legal or customs advice.